well the boat stands were made in the week so the dart 18 could sit on top. and old salty sit underneath.
6th may was the move day and greeted at swanage by sun rather than the forcast over cast.
the stands were installed and all the bottom filled with sand and pebbles. the boat was then put on top and then pratised taking on and off,
old salty was then rigged and eventually about 445pm sailed or rather drifted past the pier.
took some pics to mark the event
No comments:
Post a Comment