on arriving at Swanage to sail "ERL" i noticed the boat was rather heavy and could hear water moving. when i checked the rear bung alot of water came out.
after checking the boat the port gunwhale nr the trolley support was split for about a foot.
boat was tipped on its side and the affending area prepped to allow some isopan p40 filler to be applied. using a soni worx cutting tool to remove all the old prev repair the old owner must have done
the fibreglass soon went off and manged to rub it down as well using a sanding pad on the same tool. need s more finnish work to clean up but hopefully done the job
No comments:
Post a Comment