october 1st the rains had been going for some time and the waterlevel was already on the foreshore, with more rain over saturday and Sunday i decided to make a mad dash in the car to collect Mutley93 roads were busy but it had to be done , a good trip up and ventured down the lane side of the lake to see the views.
we arrived at 6pm and were done by 7pm ,all was tied down well or so we thought.
at Aberystwyth rbt to head home the lightboard came off so we pulled over tried to fix it back on. a few other things ad we were on our way.
the trolley needs bolting down as it judders on bumps , lightboard needs better pintle brackets.
No comments:
Post a Comment